The proposed project consists of widening SH 302 from west of Mentone at US 285 to east of Notrees at FM 2019 from a two-lane undivided highway to a four-lane divided highway with two travel lanes in each direction, a center median, inside and outside shoulders and median openings, as needed. The proposed project is approximately 59-miles long. At this time, there are no proposed improvements within Mentone or Kermit in the following Texas counties:  Reeves, Loving, Winkler, Ector.

Contact us to learn how this eminent domain project will affect your land and how we can help protect your rights.

 

 

David Todd
Connect with me
Austin Texas Eminent Domain Condemnation Attorney