The proposed project would widen the existing SH 75 from a two-lane undivided roadway with open ditches to a four-lane, divided roadway with curb and gutter drainage. The project length is approximately five miles. The proposed roadway would include two 12-foot-wide lanes in each direction, and 12-foot-wide shoulders. The proposed roadway would have a flush median from FM 3083 to League Line Road, and an 18-foot-wide raised median from League Line Road to FM 2432.
If your land may be taken for a public project, watch our Texas Eminent Domain Condemnation Video Guide, then contact us to learn how we can help at (512) 472-7799.