PROJECT SUMMARY

FM 51

 

 

           

CSJ:

            0313-02-057, 0171-03-070

           

COUNTY:    

            Parker, TX

 

ACQUIRING AUTHORITY:

            TXDOT in cooperation with Parker County

 

PARAMETERS:      

Widen FM 51 (Main St) from Pojo Rd to Roberson Ave and SH 199 from South Ash St to Old Springtown Rd  

                                   

SCHEDULE:

            R/W Acquisition Summer 2018 - Winter 2018

 

The proposed project is needed to improve safety and reduce congestion on FM 51 and at the intersection of FM 51 and SH 199. The proposed project plan includes reconstruction of FM 51 from North of Pojo Road to Roberson Avenue, reconstruction of the FM 51 and SH 199 intersection with additional turn lanes, and a bridge replacement and center turn lane on FM 51. The FM 51 and SH 199 project would provide congestion mitigation for Parker County residents by providing additional turn lanes at the intersection and through the City of Springtown to improve mobility. The project will also provide sidewalks within the project limits to improve pedestrian mobility and safety.

For more information click here.

If your land is affected by this project, learn how to protect your rights by downloading our free Texas Eminent Domain Guide.

David Todd
Connect with me
Austin Texas Eminent Domain Condemnation Attorney